I need to demo and remove a footer that's about 10' below grade and I'm trying to figure out if I should spend the time building an entrance and get the machine down to grade or try to reach it from above. Excavation is benched back about 7' and we're using a Komatsu PC308 excavator...
top of page
To see this working, head to your live site.
Comments
bottom of page